The1200KW Cummins Diesel Generatoris a top-tier power solution engineered for high reliability and efficiency. Powered by theCummins KTA50-G8engine and equipped with aStamford PI734B1alternator, this generator delivers aprime power output of 1120KWand astandby power of 1200KWat a frequency of50Hz. Designed to meet industrial and commercial power needs, it ensures consistent operation with advanced fuel efficiency and an intelligent control system.
Key Features
✔Powerful Performance:Equipped with aCummins KTA50-G8engine, delivering high power and efficiency.
✔Reliable Alternator:Fitted with aStamford PI734B1 alternatorfor stable voltage and frequency output.
✔Advanced Fuel System:Incorporates PT fuel injection technology for improved combustion and fuel efficiency.
✔Superior Cooling System:High-capacitygear-driven centrifugal water pumpensures effective cooling.
✔Robust Construction:Built for durability withlow maintenance requirementsand along operational lifespan.
✔Auto Synchronization Panel (Deep Sea DSE Control Module)
✔Containerized Generator Set
✔Mobile Trailer Power Station
✔Weatherproof Enclosure
✔Silent Mobile Power Station
✔Remote Monitoring Interface
FAQ:
1. How to calculate diesel generator fuel consumption?
Fuel consumption is determined by multiplying the generator’s rated power (kW) by the manufacturer’s specific fuel consumption rate (L/kWh). Example: A50 kWgenerator with a consumption rate of0.2 L/kWhwill use10 liters per hour.
2. How to select the right size diesel generator?
Calculate your total power requirements by summing up the power ratings of all connected equipment. Choose a generator with20-30% extra capacityto accommodate startup surges and ensure smooth operation.
3. How to maintain a diesel generator in high humidity conditions?
Keep Dry:Store the generator in aventilated, drylocation.
Regular Inspection:Check formoisture, rust, and corrosion.
Air Filtration:Clean theair filter regularlyto prevent moisture buildup.
Routine Operation:Run the generator periodically to keep components dry and lubricated.
4. Diesel Generator Maintenance Checklist
Daily:Check fuel, oil, and coolant levels.
Weekly:Test the battery, run the generator briefly.
Monthly:Inspect air and fuel filters.
Quarterly:Change oil and filters, inspect belts.
Annually:Conduct a fullengine tune-upandload test.
5. Silent Diesel Generator Buying Guide
Considerpower output, noise levels, fuel efficiency, build quality, and control panel features. Also, evaluate thebrand reputationandafter-sales supportbefore purchasing.
OPTIONAL FUNCTION
Logistics Packaging
Contact us today to learn more about how the 1200kW Cummins Diesel Generator can provide a robust and efficient power solution tailored to your needs.
📧 Email: [ gmail@xn-gen.com]
📞 Phone: [+86 15216161715]
🌐 Website: [xn-gen.com]
Generator Maintenance and Servicing
At XN-GEN, we offer long-term maintenance agreements to provide professional, high-quality, and hassle-free service for our customers. Our maintenance services ensure the optimal performance and longevity of your generator set. Below is a general guideline for maintenance procedures (please note that specific actions may vary based on the model and operational status of each generator set).
Routine Maintenance
Regular inspections and upkeep are crucial to ensuring the reliability of your generator. The following checks should be performed regularly:
Inspect all rotating components and tighten any loose bolts.
Check the oil level in the crankcase and add oil if necessary.
Monitor fuel levels in the tank.
Inspect the coolant level in the radiator.
Examine fuel and water pipelines for any leaks or loose connections.
Ensure the intake and exhaust systems, along with cylinder gaskets, are properly sealed.
Clean any oil stains or dust accumulation on the generator to maintain a tidy machine room.
Maintenance Plan for Standby Generators
(Recommended for backup generators used in residential communities, commercial buildings, hospitals, government facilities, tourist attractions, factories, and other locations where power outages are rare.)
Professional Maintenance (Every Six Months or Annually)
In addition to routine maintenance, a comprehensive service should be performed every six months or once a year:
Conduct a thorough inspection of the fuel, electrical, cooling, and lubrication systems to ensure proper functionality.
Perform a no-load test run for 5-10 minutes to lubricate the system. Assess the generator's performance using auditory, visual, and olfactory checks.
Replace consumable filters, including air, diesel, oil, water, and fuel-water separators.
Drain and replace coolant, ensuring proper radiator function.
Check and replenish the battery electrolyte or distilled water as needed.
After completing the maintenance, conduct a final inspection and clean the generator set.
Perform another 5-10 minute no-load test, record performance parameters, and provide optimization recommendations before customer acceptance.
Maintenance Plan for Continuous Operation Generators
(Recommended for generators in construction sites, frequently power-outage-prone factories, areas with insufficient transformer capacity, project testing sites, or locations without access to the main grid.)
Level 1 Maintenance (Every 50-80 Hours)
This includes all routine maintenance tasks plus:
Clean the air filter and replace it if necessary.
Replace the diesel filter, air filter, and water filter.
Inspect the tension of the drive belt and adjust if needed.
Lubricate all grease fittings and moving components.
Replace coolant to maintain effective cooling performance.
Level 2 Maintenance (Every 250-300 Hours)
Includes Level 1 maintenance tasks, with additional checks:
Clean and inspect pistons, piston pins, cylinder liners, piston rings, and connecting rod bearings for wear.
Examine the main bearing for any signs of looseness or abnormal wear.
Remove scale and sediment from the cooling system to ensure proper heat dissipation.
Clear carbon deposits from the combustion chamber and intake/exhaust passages.
Inspect and adjust valve clearances, valve seats, push rods, and rocker arms.
Clean turbocharger rotors and check bearings and impellers for wear, replacing if necessary.
Tighten or replace any loosened or damaged bolts in the generator-diesel engine coupling.
Level 3 Maintenance (Every 500-1000 Hours)
Includes Level 1 and Level 2 maintenance tasks, along with additional services:
Check and adjust the fuel injection timing.
Clean the fuel tank to remove contaminants.
Clean the oil sump to prevent sludge buildup.
Inspect and test the fuel injectors for optimal atomization.
By following this structured maintenance plan, generator owners can ensure consistent performance, increased lifespan, and reduced risk of unexpected failures. Our expert team at XN-GEN is dedicated to delivering superior service to keep your power supply reliable at all times.
For more information or to schedule maintenance, contact us today!
1. Are you a factory or a trading company?
We are a factory specializing in the production of various types of generator sets. Our manufacturing facility ensures high-quality production and strict quality control.
2. What are your main markets?
Our products are widely exported to South America, the Middle East, Southeast Asia, and Africa, catering to diverse power needs across different industries.
3. How do you ensure product quality?
We implement strict quality control measures at every stage of production. Before delivery, all generator sets undergo load testing inside a shipping container to ensure optimal performance and reliability.
4. What is your warranty policy?
Our products come with an industry-standard warranty of one year or 1,000 operating hours (whichever comes first). We also provide technical support and spare parts services.
5. Can we customize the generator with our logo or design?
Yes! We offer custom branding for authorized logos and designs, allowing you to personalize the generator’s appearance according to your business needs.
6. What is your delivery time?
Our standard production and delivery time is within 15 working days, depending on order quantity and customization requirements.
7. How can I become your distributor?
We welcome partnerships with companies that have strong marketing resources and after-sales service capabilities. If you meet these criteria and are interested in collaborating, feel free to contact us for further discussions.
8. Do you provide after-sales support?
Yes! We offer technical assistance, spare parts supply, and remote troubleshooting to ensure seamless operation of our generator sets.
9: What is the payment terms you can accept?
A: T/T, 30% deposit, 70% will be paid before delivery;