Daily Maintenance

  1. Inspect and tighten all rotating component connection bolts if necessary.
  2. Check the engine oil level in the oil sump and top up if required.
  3. Monitor the fuel level in the tank.
  4. Verify the coolant level in the radiator.
  5. Inspect fuel and water pipelines for leaks or loose connections.
  6. Ensure proper sealing of the intake and exhaust manifolds with the cylinder gasket.
  7. Clean surface oil stains and dust, keeping the generator room neat and tidy.

Onderhoudsplan vir bystandkragopwekkers

(For locations such as residential complexes, office buildings, Hospitale, Regeringsfasiliteite, scenic spots, and factories where power outages are rare, and the generator is primarily used for emergencies like fire safety and scheduled maintenance.)

Professionele instandhouding (Elke 6-12 months)

  1. Conduct a comprehensive inspection of the generator’s water, Elektriese, fuel, and air systems to ensure normal operation.
  2. Voer 'n geen-vrag toetslopie uit vir 5-10 minutes to lubricate internal components and assess performance through observation, sound, and smell.
  3. Replace consumables, including air filters, fuel filters, engine oil, oil filters, water filters, en brandstof-water skeiers.
  4. Change the coolant and replenish radiator additives.
  5. Refill battery electrolyte or distilled water as needed.
  6. Conduct a final inspection after maintenance and clean the unit.
  7. Conduct another 5-10 minuut geen-laai toets, record key performance parameters, and provide optimization recommendations for customer review and acceptance.

Maintenance Plan for Continuous-Use Generators

(For environments such as construction sites, factories with frequent power outages, facilities with insufficient transformer capacity, Projek toets webwerwe, and remote areas without grid power, where generators operate frequently or continuously.)

Vlak 1 Instandhouding (Elke 50-80 hours)

Includes daily maintenance, plus:

  1. Clean the air filter; replace it if necessary.
  2. Replace the fuel filter, Lugfilter, en waterfilter.
  3. Inspect the tension of the drive belts.
  4. Lubricate all grease fittings and moving parts.
  5. Replace coolant if needed.

Vlak 2 Instandhouding (Elke 250-300 hours)

Includes daily and Level 1 maintenance, plus:

  1. Clean and inspect the pistons, suierpenne, silinder voerings, suier ringe, en verbindingsstanglaers vir slytasie.
  2. Check for looseness in the main bearing inner and outer rings.
  3. Remove scale and sediment from the cooling system.
  4. Clean carbon deposits from the combustion chamber and intake/exhaust ports.
  5. Inspect the condition of valves, klep sitplekke, stootstawe, en tuimelarms, adjusting or regrinding as needed.
  6. Clean the turbocharger rotor, inspect bearings and impellers, and replace if necessary.
  7. Check generator-to-engine coupling bolts for looseness or thread damage; replace if required.

Vlak 3 Instandhouding (Elke 500-1000 hours)

Includes daily, Vlak 1, en vlak 2 maintenance, plus:

  1. Inspect and adjust fuel injection timing.
  2. Clean the fuel tank thoroughly.
  3. Drain and clean the oil sump.
  4. Inspect fuel injector spray patterns and atomization quality.
By following these structured maintenance procedures, XN-GEN ensures reliable and long-lasting generator performance, reducing the risk of unexpected failures and extending the service life of your equipment. For professional maintenance services, contact our team for tailored solutions.